Optimizing the supply chain configuration for make-to-order manufacturing
From MaRDI portal
Publication:1926828
DOI10.1016/j.ejor.2012.03.025zbMath1253.90049OpenAlexW1978169196MaRDI QIDQ1926828
Publication date: 29 December 2012
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2012.03.025
project managementresource constraintssourcingsupply chain designmake-to-order (MTO) manufacturingmath programming
Mixed integer programming (90C11) Transportation, logistics and supply chain management (90B06) Production models (90B30)
Related Items (9)
Production planning and pricing policy in a make-to-stock system with uncertain demand subject to machine breakdowns ⋮ Production lead-time hedging and order allocation in an MTO supply chain ⋮ Two bounds for integrating the virtual dynamic cellular manufacturing problem into supply chain management ⋮ MIP heuristics for a resource constrained project scheduling problem with workload stability constraints ⋮ Optimal workforce assignment to operations of a paced assembly line ⋮ An updated survey of variants and extensions of the resource-constrained project scheduling problem ⋮ Optimal configuration of a green product supply chain with guaranteed service time and emission constraints ⋮ Lead-time quotation and hedging coordination in make-to-order supply chain ⋮ Flexible capacity strategy with multiple market periods under demand uncertainty and investment constraint
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Selection of a dynamic supply portfolio in make-to-order environment with risks
- A branch and bound algorithm for minimizing makespan on a single machine with unequal release times under learning effect and deteriorating jobs
- Some single-machine scheduling with both learning and deterioration effects
- A quantity discount approach to supply chain coordination
- Fuzzy multi-objective programming for supplier selection and risk modeling: a possibility approach
- Modelling setup times, process batches and transfer batches using activity network logic
- Resource-constrained project scheduling. Exact methods for the multi-mode case
- Activity-on-node networks with minimal and maximal time lags and their application to make-to-order production
- Constraint-based scheduling: Applying constraint programming to scheduling problems.
- Resource-constrained project scheduling: A survey of recent developments.
- Project scheduling. A research handbook.
- New model and heuristics for safety stock placement in general acyclic supply chain networks
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Constraint and integer programming. Toward a unified methodology.
- A fuzzy linear programming based approach for tactical supply chain planning in an uncertainty environment
- A state-of-the-art review on scheduling with learning effects
- A model and procedure for competitive bidding under resource constraints
- Perspectives in modern project scheduling.
- Algorithms for Hybrid MILP/CP Models for a Class of Optimization Problems
- Logic, Optimization, and Constraint Programming
- Optimizing the Supply Chain Configuration for New Products
- Supply Chain Scheduling: Batching and Delivery
- Measures of the restrictiveness of project networks
- Learning Curves, Production Rate, and Program Costs
- Production and Cost Functions: An Econometric Survey
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- A study of simple rules for subcontracting in make-to-order manufacturing
This page was built for publication: Optimizing the supply chain configuration for make-to-order manufacturing