Rescheduling for new orders on a single machine with setup times
From MaRDI portal
Publication:1926981
DOI10.1016/j.ejor.2012.05.046zbMath1253.90109OpenAlexW2078261576MaRDI QIDQ1926981
Christophe Lenté, Vincent T'kindt, Hoogeveen, J. A.
Publication date: 29 December 2012
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2012.05.046
Analysis of algorithms and problem complexity (68Q25) Abstract computational complexity for mathematical programming problems (90C60) Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35)
Related Items (13)
Rescheduling problems with allowing for the unexpected new jobs arrival ⋮ Single machine rescheduling for new orders with maximum lateness minimization ⋮ Rescheduling on identical parallel machines with machine disruptions to minimize total completion time ⋮ Rescheduling with new orders and general maximum allowable time disruptions ⋮ Integrated rescheduling and preventive maintenance for arrival of new jobs through evolutionary multi-objective optimization ⋮ Predictive-reactive strategy for identical parallel machine rescheduling ⋮ Manufacturing rescheduling after crisis or disaster-caused supply chain disruption ⋮ Single-machine rescheduling problems with learning effect under disruptions ⋮ Rescheduling problems with agreeable job parameters to minimize the tardiness costs under deterioration and disruption ⋮ Single-machine rescheduling with deterioration and learning effects against the maximum sequence disruption ⋮ Decision model for the customer order decoupling point considering order insertion scheduling with capacity and time constraints in logistics service supply chain ⋮ Rescheduling due to machine disruption to minimize the total weighted completion time ⋮ A bi‐objective approach to reschedule new jobs in a one machine model
Cites Work
- Rescheduling with release dates to minimize makespan under a limit on the maximum sequence disruption
- Rescheduling problems with deteriorating jobs under disruptions
- Rescheduling on a single machine with part-type dependent setup times and deadlines
- Rescheduling manufacturing systems: A framework of strategies, policies, and methods
- Multicriteria scheduling problems: a survey
- Rescheduling for Multiple New Orders
- Rescheduling for New Orders
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
This page was built for publication: Rescheduling for new orders on a single machine with setup times