Optimization problems of replacement first or last in reliability theory
From MaRDI portal
Publication:1927000
DOI10.1016/J.EJOR.2012.05.035zbMath1253.90100OpenAlexW1982032667MaRDI QIDQ1927000
Publication date: 29 December 2012
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2012.05.035
minimal repaircumulative damage modelworking cycleage replacementperiodic replacementreplacement last
Reliability, availability, maintenance, inspection in operations research (90B25) Reliability and life testing (62N05)
Related Items (23)
Generalized multi-parameter preventive replacement policy for systems with random processing times ⋮ FURTHER RESULTS ON STOCHASTIC ORDERINGS AND AGING CLASSES IN SYSTEMS WITH AGE REPLACEMENT ⋮ Which is better for replacement policies with continuous or discrete scheduled times? ⋮ Preventive replacement policies for parallel systems with deviation costs between replacement and failure ⋮ Optimal two-threshold replacement policy in a cumulative damage model ⋮ Over-time and over-level replacement policies with random working cycles ⋮ Optimization of continuous and discrete scheduled times for a cumulative damage system with age-dependent maintenance ⋮ Approximate calculations of age-based random replacement times ⋮ Preventive replacement policies with products update announcements ⋮ Optimal scheduling replacement policies for a system with multiple random works ⋮ Optimal preventive replacement policy for operating products with renewing free-replacement warranty ⋮ Optimum sequential preventive maintenance first or last policies with imperfect maintenance for a system subject to shocks ⋮ Replacement model with random replacement time ⋮ Optimal preventive replacement policies for a system with discrete scheduled times ⋮ Periodic Replacement Policies and Comparisons with Their Extended Policies ⋮ Optimization issues in \(k\)-out-of-\(n\) systems ⋮ Optimal periodic and random inspections with first, last and overtime policies ⋮ Optimal preventive ``maintenance-first or -last policies with generalized imperfect maintenance models ⋮ Replacement policies with general models ⋮ Optimal preventive policies for imperfect maintenance models with replacement first and last ⋮ Random maintenance policies for sustaining the reliability of the product through 2D-warranty ⋮ Optimal preventive replacement last policy for a successive random works system with random lead time ⋮ Periodic replacement policies with shortage and excess costs
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- A note on replacement policy for a system subject to non-homogeneous pure birth shocks
- Maintenance scheduling of a protection system subject to imperfect inspection and replacement
- Shock and damage models in reliability theory
- Complex system maintenance handbook
- Maintenance for industrial systems
- Alternative time scales and failure time models
- Extended block replacement policy with shock models and used items
- Ship maintenance scheduling by genetic algorithm and constraint-based reasoning
- Renewal analysis of a replacement process
- Optimal age-replacement policy of a system subject to shocks with random lead-time
- Optimal inspection of a complex system subject to periodic and opportunistic inspections and preventive replacements
- Two shock and wear systems under repair standing a finite number of shocks
- Optimal Policies for a Database System with Two Backup Schemes
- Optimal imperfect preventive maintenance policies for a used system
This page was built for publication: Optimization problems of replacement first or last in reliability theory