Solving project scheduling problem with the philosophy of fuzzy random programming
From MaRDI portal
Publication:1927267
DOI10.1007/s10700-012-9133-xzbMath1254.90070OpenAlexW2027173717MaRDI QIDQ1927267
Publication date: 31 December 2012
Published in: Fuzzy Optimization and Decision Making (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10700-012-9133-x
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Fuzzy and other nonstochastic uncertainty mathematical programming (90C70)
Related Items (3)
Arithmetic operations for LR mixed fuzzy random variables via mean chance measure with applications ⋮ Uncertain mean-variance model for dynamic project portfolio selection problem with divisibility ⋮ Comparison of a fuzzy genetic and simulated annealing algorithm approach for project time-cost tradeoff
Cites Work
- Unnamed Item
- Unnamed Item
- Fuzzy project scheduling problem and its hybrid intelligent algorithm
- New fuzzy models for time-cost trade-off problem
- Statistics with vague data
- Depedent-chance programming: A class of stochastic optimization
- Fuzzy random variables - I. Definitions and theorems
- Fuzzy random variables - II. Algorithms and examples for the discrete case
- Using fuzzy set theory in a scheduling problem: A case study
- A fuzzy project scheduling approach to minimize schedule risk for product development
- Uncertainty theory. An introduction to its axiomatic foundations.
- Project scheduling problem with stochastic activity duration times
- Chance-Constrained Programming
- A fuzzy set approach to activity scheduling for product development
- Critical-Path Planning and Scheduling: Mathematical Basis
- Critical Path Analyses Via Chance Constrained and Stochastic Programming
- Minimizing Resource Availability Costs in Time-Limited Project Networks
- Fuzzy random variables
- Uncertainty modelling in software development projects (With case study)
This page was built for publication: Solving project scheduling problem with the philosophy of fuzzy random programming