Capacity management under uncertainty with inter-process, intra-process and demand interdependencies in high-flexibility environments
From MaRDI portal
Publication:1936595
DOI10.1007/s00291-012-0285-4zbMath1260.90019OpenAlexW2047626002MaRDI QIDQ1936595
Lars Petersen, Marcus Schweitzer, Peter Letmathe
Publication date: 6 February 2013
Published in: OR Spectrum (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s00291-012-0285-4
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- A central limit theorem for \(m\)-dependent random variables
- General estimation theorems for the distribution of sums of a random number of random terms
- Random sums of exchangeable variables and actuarial applications
- Central limit theorems for dependent variables. II
- Safety stock determination with correlated demands and arbitrary lead times
- Approximation of the distributions of sums of a random number of independent random variables by mixtures of Gaussian measures
- Asymptotic normality for random sums of linear processes
- The newsstand problem: A capacitated multiple-product single-period inventory problem
- Managing production with flexible capacity deployment for serial multi-stage manufacturing systems
- Improving activity-based costing heuristics by higher-level cost drivers
- Multivariate insurance models: an overview
- A central limit theorem for m-dependent random variables with unbounded m
- The central limit theorem for dependent random variables
- Modeling and Worker Motivation in JIT Production Systems
- Managing Flexible Capacity in a Make-to-Order Environment
- Kolmogorov-Smirnov Type Test-Statistics For The Gamma, Erlang-2 And The Inverse Gaussian Distributions When The Parameters Are Unknown.
- Corrigendum to central limit theorems for dependent variables. I
- Determining Safety Stock in the Presence of Stochastic Lead Time and Demand
- Central Limit Theorems for dependent variables. I
- On Wald's identity for dependent variables
- Describing processing time when simulating JIT environments
- A Note on the Central Limit Theorems for Dependent Random Variables
- Manufacturing flexibility: A literature review
- The Distribution Free Newsboy Problem: Review and Extensions
- Safety Stock Determination with Serially Correlated Demand in a Periodic-Review Inventory System
- On the central limit theorem for sums of dependent random variables
- The Impact of Uncertainty on a Production Line
- The asymptotic distribution of the sum of a random number of random variables
- Large-sample theory of sequential estimation
- Optimal Inventory Policy
- On Cumulative Sums of Random Variables
- Some Generalizations of the Theory of Cumulative Sums of Random Variables
- On the central limit theorem for the sum of a random number of independent random variables
This page was built for publication: Capacity management under uncertainty with inter-process, intra-process and demand interdependencies in high-flexibility environments