Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Weighted completion time minimization on a single-machine with a fixed non-availability interval: differential approximability

From MaRDI portal
Publication:1941538
Jump to:navigation, search

DOI10.1016/j.disopt.2012.11.002zbMath1258.90040OpenAlexW1974854113MaRDI QIDQ1941538

Vangelis Th. Paschos, Imed Kacem

Publication date: 13 March 2013

Published in: Discrete Optimization (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.disopt.2012.11.002


zbMATH Keywords

schedulingworst-case analysisdifferential approximationweighted flow-time


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35)


Related Items (4)

Optimizing the half-product and related quadratic Boolean functions: approximation and scheduling applications ⋮ Single-machine scheduling with operator non-availability to minimize total weighted completion time ⋮ Differential approximation schemes for half-product related functions and their scheduling applications ⋮ Heuristics for the single machine weighted sum of completion times scheduling problem with periodic maintenance




This page was built for publication: Weighted completion time minimization on a single-machine with a fixed non-availability interval: differential approximability

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1941538&oldid=14375065"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 1 February 2024, at 16:46.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki