Weighted completion time minimization on a single-machine with a fixed non-availability interval: differential approximability
From MaRDI portal
Publication:1941538
DOI10.1016/j.disopt.2012.11.002zbMath1258.90040OpenAlexW1974854113MaRDI QIDQ1941538
Vangelis Th. Paschos, Imed Kacem
Publication date: 13 March 2013
Published in: Discrete Optimization (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.disopt.2012.11.002
Related Items (4)
Optimizing the half-product and related quadratic Boolean functions: approximation and scheduling applications ⋮ Single-machine scheduling with operator non-availability to minimize total weighted completion time ⋮ Differential approximation schemes for half-product related functions and their scheduling applications ⋮ Heuristics for the single machine weighted sum of completion times scheduling problem with periodic maintenance
This page was built for publication: Weighted completion time minimization on a single-machine with a fixed non-availability interval: differential approximability