A note on makespan minimization in proportionate flow shops
From MaRDI portal
Publication:1944041
DOI10.1016/j.ipl.2010.10.016zbMath1260.90088OpenAlexW2048896639MaRDI QIDQ1944041
Byung-Cheon Choi, Joseph Y.-T. Leung, Michael L. Pinedo
Publication date: 4 April 2013
Published in: Information Processing Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ipl.2010.10.016
Related Items (1)
Cites Work
- Unnamed Item
- Minimizing maximum completion time in a proportionate flow shop with one machine of different speed
- Time-dependent scheduling
- A note on the proportionate flow shop with a bottleneck machine
- Minimizing total weighted completion time in a proportionate flow shop
- The three-machine proportionate flow shop problem with unequal machine speeds
- A survey of scheduling with controllable processing times
- A state-of-the-art review on scheduling with learning effects
- Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness
- Minimizing Total Completion Time in a Two-Machine Flowshop: Analysis of Special Cases
- Focused Scheduling in Proportionate Flowshops
- Ordered Flow Shop Problems with no In-Process Waiting: Further Results
- Flowshop Sequencing Problem with Ordered Processing Time Matrices
- Flowshop sequencing problem with ordered processing time matrices: A general case
- The Complexity of Flowshop and Jobshop Scheduling
- Flowshop-scheduling problems with makespan criterion: a review
This page was built for publication: A note on makespan minimization in proportionate flow shops