Interactive fuzzy goal programming for a multi-objective closed-loop logistics network
From MaRDI portal
Publication:1945093
DOI10.1007/s10479-012-1192-4zbMath1260.90170OpenAlexW2082483690MaRDI QIDQ1945093
Lixin Miao, Dai Wenjing, Mehrdad Mehrbod, Nan Tu
Publication date: 2 April 2013
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-012-1192-4
Multi-objective and goal programming (90C29) Deterministic network models in operations research (90B10) Fuzzy and other nonstochastic uncertainty mathematical programming (90C70)
Related Items (5)
Pricing decisions for substitutable products with horizontal and vertical competition in fuzzy environments ⋮ A fuzzy multi-criteria approach for robust operating room schedules ⋮ Design of a multi echelon product recovery embeded reverse logistics network for multi products and multi periods ⋮ Multi-objective fuzzy mathematical modelling of closed-loop supply chain considering economical and environmental factors ⋮ Multi-objective optimization for a closed-loop network design problem using an improved genetic algorithm
Cites Work
- A possibilistic programming approach for closed-loop supply chain network design under uncertainty
- A robust optimization approach to closed-loop supply chain network design under uncertainty
- A closed-loop logistic model with a spanning-tree based genetic algorithm
- A generic stochastic model for supply-and-return network design
- A fuzzy goal programming approach to multi-objective optimization problem with priorities
- Scope of stationary multi-objective evolutionary optimization: a case study on a hydro-thermal power dispatch problem
- A strategic and tactical model for closed-loop supply chains
- An interactive fuzzy programming system
- Interactive multiple objective programming subject to flexible constraints
- Fuzzy programming and linear programming with several objective functions
- The return plant location problem: Modelling and resolution
- Questionnaire design improvement and missing item scores estimation for rapid and efficient decision making
- A memetic algorithm for bi-objective integrated forward/reverse logistics network design
- A closed-loop logistics model for remanufacturing
- Concurrent product and closed-loop supply chain design with an application to refrigerators
This page was built for publication: Interactive fuzzy goal programming for a multi-objective closed-loop logistics network