A fully polynomial time approximation scheme for weighted job-dependent earliness-tardiness problem with agreeable ratios
From MaRDI portal
Publication:1956478
DOI10.1007/S12597-009-0026-XzbMath1201.90082OpenAlexW2051419134MaRDI QIDQ1956478
Publication date: 22 September 2010
Published in: Opsearch (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s12597-009-0026-x
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Cites Work
- Unnamed Item
- Scheduling around a small common due date
- Scheduling to minimize weighted earliness and tardiness about a common due-date
- Scheduling about a common due date with job-dependent asymmetric earlines and tardiness penalties
- The weighted common due date single machine scheduling problem revisited
- Minimizing weighted number of tardy jobs and weighted earliness-tardiness penalties about a common due date
- Earliness-Tardiness Scheduling Problems, I: Weighted Deviation of Completion Times About a Common Due Date
- An Approximation Scheme for Minimizing Agreeably Weighted Variance on a Single Machine
- A Fully Polynomial Approximation Scheme for the Weighted Earliness–Tardiness Problem
- A Functional Equation and its Application to Resource Allocation and Sequencing Problems
This page was built for publication: A fully polynomial time approximation scheme for weighted job-dependent earliness-tardiness problem with agreeable ratios