Using metaheuristics in multiobjective resource constrained project scheduling

From MaRDI portal
Publication:1969837

DOI10.1016/S0377-2217(99)00163-0zbMath0955.90037OpenAlexW2028444861MaRDI QIDQ1969837

Ana Viana, Jorge Pinho de Sousa

Publication date: 19 March 2000

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/s0377-2217(99)00163-0



Related Items

On the computational efficiency of multiple objective metaheuristics. The knapsack problem case study, A metaheuristic solution approach for the time-constrained project scheduling problem, Solving the biobjective zero-one knapsack problem by an efficient LP-based heuristic, Integration of electromagnetism with multi-objective evolutionary algorithms for RCPSP, Bi-objective resource-constrained project scheduling with robustness and makespan criteria, Evaluating solution sets of a posteriori solution techniques for bi-criteria combinatorial optimization problems, Approximating the Pareto optimal set using a reduced set of objective functions, Applying local rescheduling in response to schedule disruptions, Multi-objective metaheuristics for a location-routing problem with multiple use of vehicles on real data and simulated data, A lexicographic approach to the robust resource-constrained project scheduling problem, Skilled workforce scheduling in service centres, Metaheuristics for multi-mode capital-constrained project payment scheduling, Multi-objective metaheuristic algorithms for the resource-constrained project scheduling problem with precedence relations, Approximative solution methods for multiobjective combinatorial optimization. With discussion and a rejoinder by the authors., Theoretical and practical fundamentals for multi-objective optimisation in resource-constrained project scheduling problems, Evaluation of nondominated solution sets for \(k\)-objective optimization problems: an exact method and approximations, A local genetic approach to multi-objective, facility layout problems with fixed aisles, Multi-objective meta-heuristics: An overview of the current state-of-the-art, A survey of variants and extensions of the resource-constrained project scheduling problem, Minimizing total weighted late work in the resource-constrained project scheduling problem, Simulated annealing for financing cost distribution based project payment scheduling from a joint perspective, Modeling and solving a bi-objective airport slot scheduling problem, A MULTI-OBJECTIVE RISK-BASED FRAMEWORK FOR MISSION CAPABILITY PLANNING, Multi-objective tabu search using a multinomial probability mass function, MOAQ and ant-Q algorithm for multiple objective optimization problems, Resource-constrained project scheduling through the goal programming model: integration of the manager's preferences


Uses Software


Cites Work