Lower bounds and algorithms for flowtime minimization on a single machine with set-up times
From MaRDI portal
Publication:1976518
DOI<51::AID-JOS34>3.0.CO;2-K 10.1002/(SICI)1099-1425(200001/02)3:1<51::AID-JOS34>3.0.CO;2-KzbMath0966.90031MaRDI QIDQ1976518
Simon Dunstall, Andrew Wirth, Kenneth R. Baker
Publication date: 19 September 2000
Published in: Journal of Scheduling (Search for Journal in Brave)
Polyhedral combinatorics, branch-and-bound, branch-and-cut (90C57) Deterministic scheduling theory in operations research (90B35)
Related Items
A novel integer programing formulation for scheduling with family setup times on a single machine to minimize maximum lateness ⋮ An improved heuristic for parallel machine weighted flowtime scheduling with family set-up times ⋮ Branch and bound algorithms for single machine scheduling with batching to minimize the number of late jobs ⋮ A survey of scheduling problems with setup times or costs ⋮ Approximation algorithms for problems in scheduling with set-ups ⋮ An online algorithm for a problem in scheduling with set-ups and release times ⋮ A comparison of branch-and-bound algorithms for a family scheduling problem with identical parallel machines ⋮ Heuristic methods for the identical parallel machine flowtime problem with set-up times ⋮ Mathematical formulations for scheduling jobs on identical parallel machines with family setup times and total weighted completion time minimization ⋮ Online Machine Scheduling with Family Setups
Cites Work
- Unnamed Item
- Single facility multi-class job scheduling
- Single facility scheduling with multiple job classes
- Scheduling two job classes on a single machine
- Branch and bound algorithms for single-machine scheduling with batch set-up times to minimize total weighted completion time
- Single facility scheduling with major and minor setups
- Single machine scheduling with batch set-up times to minimize maximum lateness
- Local search heuristics for single machine scheduling with batch set-up times to minimize total weighted completion time
- Batch scheduling to minimize total completion time
- A Dynamic Programming Approach for Sequencing Groups of Identical Jobs
- Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity
- Sequencing Jobs to Minimize Total Weighted Completion Time Subject to Precedence Constraints
- On the Complexity of Scheduling with Batch Setup Times
- Single-Machine Scheduling with Release Dates, Due Dates and Family Setup Times
- Single Machine Scheduling with Major and Minor Setup Times: A Tabu Search Approach
- Sequencing n jobs on two machines with setup, processing and removal times separated
- Scheduling independent tasks to reduce mean finishing time
- A New Heuristic for a Single Machine Scheduling Problem with Set-up Times
- Scheduling Groups of Jobs on a Single Machine
- Single-Machine Job Sequencing with Treelike Precedence Ordering and Linear Delay Penalties
- Technical Note—Minimizing Average Flow Time with Parallel Machines