Analysis of a MAP/PH(1), PH(2)/2 production inventory system under the Bernoulli vacation scheme
From MaRDI portal
Publication:1980552
DOI10.1007/978-3-030-72247-0_29zbMath1473.90005OpenAlexW3151432457MaRDI QIDQ1980552
Publication date: 8 September 2021
Full work available at URL: https://doi.org/10.1007/978-3-030-72247-0_29
Inventory, storage, reservoirs (90B05) Applications of queueing theory (congestion, allocation, storage, traffic, etc.) (60K30)
Cites Work
- Analysis of an \(M\)/\(M\)/\(N\) queue with Bernoulli service schedule
- Numerical investigation of a multiserver retrial model
- Analysis of MAP/PH(1), PH(2)/2 queue with Bernoulli vacations
- Control of the service process in a queueing system
- Queueing systems with vacations - a survey
- \(MAP/PH(1)\), \(PH(2)/2\) finite retrial inventory system with service facility, multiple vacations for servers
- Analysis of queue-length dependent vacations and P-limited service in \(\mathrm{BMAP}/\mathrm{G}/1/N\) systems: stationary distributions and optimal control
- Analysis of MAP/PH(1), PH(2)/2 queue with Bernoulli schedule vacation, Bernoulli feedback and renege of customers
- On a retrial production inventory system with vacation and multiple servers
- Production inventory with service time and vacation to the server
- Oscillating random walk models for GI/G/1 vacation systems with Bernoulli schedules
- MAP/PH/1 queueing model with working vacation and crowdsourcing
This page was built for publication: Analysis of a MAP/PH(1), PH(2)/2 production inventory system under the Bernoulli vacation scheme