Analysis of a MAP/PH(1), PH(2)/2 production inventory system under the Bernoulli vacation scheme

From MaRDI portal
Publication:1980552

DOI10.1007/978-3-030-72247-0_29zbMath1473.90005OpenAlexW3151432457MaRDI QIDQ1980552

K. P. Jose, Pathari Beena

Publication date: 8 September 2021

Full work available at URL: https://doi.org/10.1007/978-3-030-72247-0_29







Cites Work




This page was built for publication: Analysis of a MAP/PH(1), PH(2)/2 production inventory system under the Bernoulli vacation scheme