Temporary price increase during replenishment lead time
From MaRDI portal
Publication:1988857
DOI10.1016/J.APM.2019.09.050zbMath1481.90017OpenAlexW2979420519WikidataQ127130304 ScholiaQ127130304MaRDI QIDQ1988857
Burcu Esmer, Nagihan Çömez-Dolgan, Lama Moussawi-Haidar, Mohamad Y. Jaber
Publication date: 24 April 2020
Published in: Applied Mathematical Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.apm.2019.09.050
Cites Work
- Unnamed Item
- Unnamed Item
- The theory and practice of revenue management
- Coordinating inventory control and pricing strategies: the continuous review model
- Combined Pricing and Inventory Control Under Uncertainty
- Stockout Compensation: Joint Inventory and Price Optimization in Electronic Retailing
- Price discounts for increased profitability under partial backordering
- A Periodic-Review Base-Stock Inventory System with Sales Rejection
- Dynamic Pricing in the Presence of Inventory Considerations: Research Overview, Current Practices, and Future Directions
- Tailored Supply Chain Decision Making Under Price-Sensitive Stochastic Demand and Delivery Uncertainty
- On the Value of Mitigation and Contingency Strategies for Managing Supply Chain Disruption Risks
- Optimal pricing and inventory control policy in periodic-review systems with fixed ordering cost and lost sales
- OPTIMAL PRICING AND PRODUCTION POLICIES OF A MAKE-TO-STOCK SYSTEM WITH FLUCTUATING DEMAND
- A Continuous Review Model for an Inventory System with Two Supply Modes
- Continuous Review (s, S) Policies with Lost Sales
- Optimal Dynamic Pricing of Inventories with Stochastic Demand over Finite Horizons
- Pricing and the Newsvendor Problem: A Review with Extensions
- Optimal Starting Times for End-of-Season Sales and Optimal Stopping Times for Promotional Fares
- Coordinating Inventory Control and Pricing Strategies with Random Demand and Fixed Ordering Cost: The Infinite Horizon Case
- Age-based vs. stock level control policies for a perishable inventory system
This page was built for publication: Temporary price increase during replenishment lead time