Multi-parallel work centers scheduling optimization with shared or dedicated resources in low-volume low-variety production systems
From MaRDI portal
Publication:1988965
DOI10.1016/j.apm.2019.11.047zbMath1481.90187OpenAlexW2990065175WikidataQ126640221 ScholiaQ126640221MaRDI QIDQ1988965
Sharareh Taghipour, Arya Russell
Publication date: 24 April 2020
Published in: Applied Mathematical Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.apm.2019.11.047
integer programminggoal programmingshared resourcesscheduling optimizationlow-volume low-variety production systemsparallel work centers
Integer programming (90C10) Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35) Production models (90B30)
Related Items
Cites Work
- Unnamed Item
- Evaluation of mathematical models for flexible job-shop scheduling problems
- Parallel identical machines scheduling with deteriorating jobs and total absolute differences penalties
- Minimizing makespan and total completion time for parallel batch processing machines with non-identical job sizes
- Event-based MILP models for resource-constrained project scheduling problems
- Time-constrained project scheduling with adjacent resources
- Scheduling projects with heterogeneous resources to meet time and quality objectives
- Minimizing weighted tardiness of job-shop scheduling using a hybrid genetic algorithm
- Flexible job shop scheduling with overlapping in operations
- Scheduling subject to resource constraints: Classification and complexity
- Goal programming and multiple objective optimizations. Part I
- Multi-mode resource availability cost problem with recruitment and release dates for resources
- A branch and bound algorithm to minimize the total weighed number of tardy jobs and delivery costs
- A hybrid metaheuristic for resource-constrained project scheduling with flexible resource profiles
- Some single-machine scheduling with sum-of-processing-time-based and job-position-based processing times
- Minimizing total weighted late work in the resource-constrained project scheduling problem
- Two-machine flow shop total tardiness scheduling problem with deteriorating jobs
- Flexible job shop scheduling problem for parallel batch processing machine with compatible job families
- Optimal robot scheduling to minimize the makespan in a three-machine flow-shop environment with job-independent processing times
- Mixed integer goal programming models for the flexible job-shop scheduling problems with separable and non-separable sequence dependent setup times
- Multi-mode resource constrained multi-project scheduling and resource portfolio problem
- Modified bottleneck-based heuristic for large-scale job-shop scheduling problems with a single bottleneck
- Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time
- Complexity Results for Multiprocessor Scheduling under Resource Constraints