A discrete artificial bee colony algorithm for the multi-objective flexible job-shop scheduling problem with maintenance activities
DOI10.1016/j.apm.2013.07.038zbMath1427.90149OpenAlexW2006785664MaRDI QIDQ1991454
Publication date: 30 October 2018
Published in: Applied Mathematical Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.apm.2013.07.038
multi-objective optimizationtabu searchartificial bee colony algorithmflexible job-shop scheduling problem with maintenance activities
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (21)
Uses Software
Cites Work
- Scheduling open shops with parallel machines to minimize total completion time
- An effective architecture for learning and evolving flexible job-shop schedules
- A tabu search algorithm with a new neighborhood structure for the job shop scheduling problem
- Flexible job shop scheduling with overlapping in operations
- Mathematical models for job-shop scheduling problems with routing and process plan flexibility
- Discrepancy search for the flexible job shop scheduling problem
- A novel differential evolution algorithm for bi-criteria no-wait flow shop scheduling problems
- Pareto-optimality approach for flexible job-shop scheduling problems: Hybridization of evolutionary algorithms and fuzzy logic
- Scheduling with limited machine availability
- Effective neighbourhood functions for the flexible job shop problem
- Routing and scheduling in a flexible job shop by tabu search
- Applying tabu search to the job-shop scheduling problem
- A comparative study of artificial bee colony algorithm
- A hybrid genetic and variable neighborhood descent algorithm for flexible job shop scheduling problems
- A genetic algorithm for the flexible job-shop scheduling problem
- A Fast Taboo Search Algorithm for the Job Shop Problem
This page was built for publication: A discrete artificial bee colony algorithm for the multi-objective flexible job-shop scheduling problem with maintenance activities