Joint optimization of preventive maintenance and spare parts inventory with appointment policy
From MaRDI portal
Publication:1992629
DOI10.1155/2017/3493687zbMath1426.90010OpenAlexW2599969539WikidataQ59147482 ScholiaQ59147482MaRDI QIDQ1992629
Yibing Yin, Jing Cai, Li Zhang, Xi Chen
Publication date: 5 November 2018
Published in: Mathematical Problems in Engineering (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2017/3493687
Approximation methods and heuristics in mathematical programming (90C59) Reliability, availability, maintenance, inspection in operations research (90B25) Inventory, storage, reservoirs (90B05)
Related Items (3)
Replacement and inventory control for a multi-customer product service system with decreasing replacement costs ⋮ Joint condition-based maintenance and spare provisioning policy for a \(K\)-out-of-\(N\) system with failures during inspection intervals ⋮ Life cycle maintenance costs for a non-exponential component
Cites Work
- An improved particle swarm optimization for the automobile spare part warehouse location problem
- A condition-based replacement and spare provisioning policy for deteriorating systems with uncertain deterioration to failure
- A condition-based order-replacement policy for a single-unit system
- A stocking policy for spare part provisioning under age based preventive replacement
- A two-step method for forecasting spare parts demand using information on component repairs
- Jointly Optimal Block-Replacement and Spare Provisioning Policy
This page was built for publication: Joint optimization of preventive maintenance and spare parts inventory with appointment policy