Configuring of excessive onboard equipment sets
From MaRDI portal
Publication:1994813
DOI10.1134/S1064230718040020zbMath1401.93149OpenAlexW2888755355MaRDI QIDQ1994813
Publication date: 2 November 2018
Published in: Journal of Computer and Systems Sciences International (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1134/s1064230718040020
Related Items (4)
Analytical configuration of a redundant system with mismatch control ⋮ Testing the configurations of redundant integrated equipment complexes ⋮ Integration of an equipment complex with a selected configuration ⋮ Generation of alternative connections of series-connected subsystems in a redundant equipment complex
Cites Work
- Unnamed Item
- An analytic approach to constructing configurations of technical systems
- An algebraic criterion for detecting the fact and time a fault occurs in control systems of dynamic plants
- Supervisory control method for redundant technical systems
- Generation of alternative solutions in the redundancy management problem for hardware complexes
This page was built for publication: Configuring of excessive onboard equipment sets