Two-agent single-machine scheduling with cumulative deterioration
From MaRDI portal
Publication:2001202
DOI10.1007/S10288-018-0388-0zbMath1415.90039OpenAlexW2892186407MaRDI QIDQ2001202
Publication date: 2 July 2019
Published in: 4OR (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10288-018-0388-0
Related Items (1)
Cites Work
- Unnamed Item
- The strong NP-hardness of the maximum lateness minimization scheduling problem with the processing-time based aging effect
- Two-agent single-machine scheduling problems under increasing linear deterioration
- Two-agent scheduling with agent specific batches on an unbounded serial batching machine
- Time-dependent scheduling
- A concise survey of scheduling with time-dependent processing times
- Complexities of some problems on multi-agent scheduling on a single machine
- A common framework and taxonomy for multicriteria scheduling problems with interfering and competing jobs: multi-agent scheduling problems
- A note on the complexity of the problem of two-agent scheduling on a single machine
- Multi-agent scheduling on a single machine with a fixed number of competing agents to minimize the weighted sum of number of tardy jobs and makespans
- Scheduling two agents with sum-of-processing-times-based deterioration on a single machine
- A multiple-criterion model for machine scheduling
- Single-machine scheduling problems with past-sequence-dependent setup times
- Multi-agent scheduling on a single machine with max-form criteria
- Multi-agent single machine scheduling
- Multi-agent scheduling on a single machine to minimize total weighted number of tardy jobs
- Competitive Two-Agent Scheduling and Its Applications
- A competitive scheduling problem and its relevance to UMTS channel assignment
- Two-Agent Scheduling with Linear Deteriorating Jobs on a Single Machine
- Scheduling Problems with Two Competing Agents
- Multiagent Scheduling
This page was built for publication: Two-agent single-machine scheduling with cumulative deterioration