Resource-constrained project scheduling with activity splitting and setup times
From MaRDI portal
Publication:2003582
DOI10.1016/j.cor.2019.05.004zbMath1458.90362OpenAlexW2944386791WikidataQ127941726 ScholiaQ127941726MaRDI QIDQ2003582
Publication date: 9 July 2019
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2019.05.004
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items
Uses Software
Cites Work
- An approach using SAT solvers for the RCPSP with logical constraints
- Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers
- Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting
- Linear programming based algorithms for preemptive and non-preemptive RCPSP
- A survey of variants and extensions of the resource-constrained project scheduling problem
- A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times
- A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem
- An iterative scheduling technique for resource-constrained project scheduling
- An efficient optimal solution procedure for the preemptive resource-constrained project scheduling problem
- Modelling setup times, process batches and transfer batches using activity network logic
- Justification and RCPSP: a technique that pays
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Batch scheduling in process industries: An application of resource-constrained project scheduling
- Managing and modelling general resource transfers in (multi-)project scheduling
- Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting
- A hybrid genetic algorithm for the resource-constrained project scheduling problem
- An evaluation of the adequacy of project network generators with systematically sampled networks
- Rangen: A random network generator for activity-on-the-node networks
- Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times
- Pre-emption in resource-constrained project scheduling
- Perspectives in modern project scheduling.
- A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- Project scheduling: The effects of problem structure on heuristic performance
- GRASP: a search algorithm for propositional satisfiability
- An Experimental Investigation and Comparative Evaluation of Production Line Balancing Techniques
- A machine program for theorem-proving
- The complexity of theorem-proving procedures
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems