A scheduling problem to minimize total weighted tardiness in the two-stage assembly flowshop
From MaRDI portal
Publication:2004254
DOI10.1155/2020/9723439zbMath1459.90098OpenAlexW3089083305MaRDI QIDQ2004254
Publication date: 14 October 2020
Published in: Mathematical Problems in Engineering (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2020/9723439
Cites Work
- Unnamed Item
- A new branch and bound algorithm for minimizing mean tardiness in two- machine flowshops
- A branch and bound algorithm for the two-stage assembly scheduling problem
- Deterministic assembly scheduling problems: a review and classification of concurrent-type scheduling models and solution procedures
- The 2-stage assembly flowshop scheduling problem with total completion time: efficient constructive heuristic and metaheuristic
- A two-stage assembly-type flowshop scheduling problem for minimizing total tardiness
- Powerful heuristics to minimize makespan in fixed, 3-machine, assembly-type flowshop scheduling
- A branch and bound algorithm to minimize the total weighted flowtime for the two-stage assembly scheduling problem
- Note on minimizing total tardiness in a two-machine flowshop
- A PSO and a tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application
- Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem
- The Two-Stage Assembly Scheduling Problem: Complexity and Approximation
This page was built for publication: A scheduling problem to minimize total weighted tardiness in the two-stage assembly flowshop