An improved algorithm for integrated production and distribution scheduling problem with committed delivery dates
From MaRDI portal
Publication:2018869
DOI10.1007/S11590-014-0755-5zbMath1339.90344OpenAlexW2000892129MaRDI QIDQ2018869
Publication date: 25 March 2015
Published in: Optimization Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s11590-014-0755-5
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (4)
Integrated production and transportation scheduling with order-dependent inventory holding costs ⋮ Production and Transportation Integration for Commit-to-Delivery Mode with General Shipping Costs ⋮ Integrated supply chain scheduling of procurement, production, and distribution under spillover effects ⋮ New exact and approximation algorithms for integrated production and transportation scheduling with committed delivery due dates and order acceptance
Cites Work
- Two-machine flowshop scheduling with intermediate transportation under job physical space consideration
- Integrated production and distribution scheduling with committed delivery dates
- Integrated Production and Outbound Distribution Scheduling: Review and Extensions
- Machine scheduling with transportation considerations
This page was built for publication: An improved algorithm for integrated production and distribution scheduling problem with committed delivery dates