Parallel machine scheduling with the total weighted delivery time performance measure in distributed manufacturing
From MaRDI portal
Publication:2026991
DOI10.1016/j.cor.2020.105126OpenAlexW3096227837MaRDI QIDQ2026991
Publication date: 21 May 2021
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2020.105126
Related Items (5)
Parallel batch processing machines scheduling in cloud manufacturing for minimizing total service completion time ⋮ Exact and matheuristic methods for the parallel machine scheduling and location problem with delivery time and due date ⋮ The due date assignment scheduling problem with the deteriorating jobs and delivery time ⋮ Unrelated parallel machine scheduling with eligibility constraints and delivery times to minimize total weighted tardiness ⋮ An efficient GRASP-like algorithm for the multi-product straight pipeline scheduling problem
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- A fast and effective subset sum based improvement procedure for workload balancing on identical parallel machines
- A GRASP based on DE to solve single machine scheduling problem with SDST
- A simulated annealing approach to minimize the maximum lateness on uniform parallel machines
- A heuristic approach for a scheduling problem with periodic maintenance and sequence-dependent setup times
- Online batch scheduling on parallel machines with delivery times
- Unbounded parallel batch scheduling with job delivery to minimize makespan
- A new heuristic algorithm for the machine scheduling problem with job delivery coordination
- Scheduling jobs on parallel machines with sequence-dependent setup times
- Scheduling identical parallel machines to minimize total weighted completion time
- Heuristics for parallel machine scheduling with delivery times
- Scheduling on uniform parallel machines to minimize maximum lateness
- Extended GRASP for the job shop scheduling problem with total weighted tardiness objective
- Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times
- Machine scheduling with job delivery coordination
- GRASP with path-relinking for the non-identical parallel machine scheduling problem with minimising total weighted completion times
- Preemptive scheduling on identical machines with delivery coordination to minimize the maximum delivery completion time
- Minimizing total tardiness in parallel machine scheduling with setup times: an adaptive memory-based GRASP approach
- A GRASP for Parallel Machine Scheduling with Time Windows
- Optimization by GRASP
- Parallel Greedy Randomized Adaptive Search Procedures
- Machine scheduling with an availability constraint and job delivery coordination
- Technical Note—Analysis of a Heuristic for One Machine Sequencing with Release Dates and Delivery Times
- ON EQUIVALENT-JOB FOR JOB-BLOCK IN 2×n SEQUENCING PROBLEM WITH TRANSPORTATION-TIMES
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Genetic Algorithms and Random Keys for Sequencing and Optimization
- Scheduling independent tasks to reduce mean finishing time
- Machine scheduling with transportation considerations
- Two-stage scheduling on identical machines with assignable delivery times to minimize the maximum delivery completion time
This page was built for publication: Parallel machine scheduling with the total weighted delivery time performance measure in distributed manufacturing