Air traffic flow management with layered workload constraints
DOI10.1016/j.cor.2020.105159OpenAlexW3109470242MaRDI QIDQ2027028
Andreas Nakkerud, Giorgio Sartor, Carlo Mannino
Publication date: 21 May 2021
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2020.105159
optimizationlinear programmingschedulingmixed integer programmingair traffic managementjob-shop schedulingair traffic flow managementhotspot problem
Large-scale problems in mathematical programming (90C06) Applications of mathematical programming (90C90) Mixed integer programming (90C11) Transportation, logistics and supply chain management (90B06) Special problems of linear programming (transportation, multi-index, data envelopment analysis, etc.) (90C08) Traffic problems in operations research (90B20)
Related Items (2)
Cites Work
- Unnamed Item
- Unnamed Item
- Scheduling models for air traffic control in terminal areas
- A variable neighbourhood search for fast train scheduling and routing during disturbed railway traffic situations
- A survey of scheduling problems with no-wait in process
- Job-shop scheduling with blocking and no-wait constraints
- Scheduling Aircraft to Reduce Controller Workload
- Optimal Real-Time Traffic Control in Metro Stations
- Efficient algorithms for interval graphs and circular-arc graphs
- A Noncompact Formulation for Job-Shop Scheduling Problems in Traffic Management
This page was built for publication: Air traffic flow management with layered workload constraints