A satisfiability and workload-based exact method for the resource constrained project scheduling problem with generalized precedence constraints

From MaRDI portal
Publication:2029253

DOI10.1016/j.ejor.2019.07.056zbMath1487.90285OpenAlexW2965695689MaRDI QIDQ2029253

Anand Subramanian, Guilherme Henrique Ismael de Azevedo, Artur Alves Pessoa

Publication date: 3 June 2021

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2019.07.056




Related Items (2)


Uses Software


Cites Work


This page was built for publication: A satisfiability and workload-based exact method for the resource constrained project scheduling problem with generalized precedence constraints