Levelling crane workload in multi-yard rail-road container terminals
From MaRDI portal
Publication:2030338
DOI10.1016/j.ejor.2020.12.063zbMath1487.90320OpenAlexW3119749549MaRDI QIDQ2030338
Malte Fliedner, Christian Pfeiffer, Arne Schulz, Benedikt Fiedrich
Publication date: 7 June 2021
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2020.12.063
Transportation, logistics and supply chain management (90B06) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Unnamed Item
- Unnamed Item
- The partitioning min-max weighted matching problem
- Optimized load planning of trains in intermodal transportation
- How to park freight trains on rail-rail transshipment yards: the train location problem
- Crane scheduling in container yards with inter-crane interference
- A generalized classification scheme for crane scheduling with interference
- An integrated model for the transshipment yard scheduling problem
- Crane scheduling in railway yards: an analysis of computational complexity
- When road trains supply freight trains: scheduling the container loading process by gantry crane between multi-trailer trucks and freight trains
- An assignment model for dynamic load planning of intermodal trains
- Determining crane areas in intermodal transshipment yards: the yard partition problem
- Determining crane areas for balancing workload among interfering and noninterfering cranes
- Crane scheduling with non-crossing constraint
- A m‐parallel crane scheduling problem with a non‐crossing constraint