Single-machine hierarchical scheduling with release dates and preemption to minimize the total completion time and a regular criterion
From MaRDI portal
Publication:2030503
DOI10.1016/J.EJOR.2020.12.006zbMath1487.90280OpenAlexW3111972328MaRDI QIDQ2030503
Publication date: 7 June 2021
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2020.12.006
Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35)
Related Items (2)
Assembly flowshop scheduling problem: speed-up procedure and computational evaluation ⋮ Single machine scheduling with release dates: a distributionally robust approach
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- SRPT applied to bandwidth-sharing networks
- Solving a bicriterion scheduling problem
- Hybrid algorithm for sequencing with bicriteria
- Complexity of single machine, multi-criteria scheduling problems
- Preemptive scheduling with two minimax criteria
- Bi-criteria Pareto-scheduling on a single machine with due indices and precedence constraints
- A note on Pareto minimizing total completion time and maximum cost
- Minimizing total completion time and maximum cost simultaneously is solvable in polynomial time
- Scheduling with release dates and preemption to minimize multiple max-form objective functions
- Two-agent single-machine scheduling with release dates and preemption to minimize the maximum lateness
- A note on the preemptive scheduling to minimize total completion time with release time and deadline constraints
- Multicriteria scheduling
- Complexity of two dual criteria scheduling problems
- An algorithm for minimizing flow time and maximum earliness on a single machine
- Centralized Wireless Data Networks With User Arrivals and Departures
- Scheduling Problems with Two Competing Agents
- Scheduling with Multiple Performance Measures: The One-Machine Case
- A single-machine problem with multiple criteria
- Minimizing Mean Flow Time With Release Time and Deadline Constraints
- One machine sequencing to minimize mean flow time with minimum number tardy
- Technical Note—A New Proof of the Optimality of the Shortest Remaining Processing Time Discipline
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Single Machine Scheduling and Selection to Minimize Total Flow Time with Minimum Number Tardy
- Single-Machine Scheduling to Minimize a Function of Two or Three Maximum Cost Criteria
- Multiagent Scheduling
- Letter to the Editor—A Proof of the Optimality of the Shortest Remaining Processing Time Discipline
- Optimal Sequencing of a Single Machine Subject to Precedence Constraints
This page was built for publication: Single-machine hierarchical scheduling with release dates and preemption to minimize the total completion time and a regular criterion