A new algorithm for resource-constrained project scheduling with breadth and depth of skills
From MaRDI portal
Publication:2030541
DOI10.1016/j.ejor.2020.10.032zbMath1487.90324OpenAlexW3097366888MaRDI QIDQ2030541
Mario Vanhoucke, Jakob Snauwaert
Publication date: 7 June 2021
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2020.10.032
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (4)
On the complexity of efficient multi-skilled team composition ⋮ A classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problem ⋮ A two‐layer approach for solving robust decentralized multiproject scheduling problem with multi‐skilled staff ⋮ Multi-project scheduling problem under shared multi-skill resource constraints
Cites Work
- Unnamed Item
- Project scheduling with flexible resources: formulation and inequalities
- Branch-and-price approach for the multi-skill project scheduling problem
- Skilled workforce scheduling in service centres
- Multi-objective decision analysis for competence-oriented project portfolio selection
- A survey of variants and extensions of the resource-constrained project scheduling problem
- A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem
- Scheduling subject to resource constraints: Classification and complexity
- An iterative scheduling technique for resource-constrained project scheduling
- A genetic algorithm for scheduling staff of mixed skills under multi-criteria
- Minimizing average project team size given multi-skilled workers with heterogeneous skill levels
- A biased random-key genetic algorithm for the project scheduling problem with flexible resources
- Scheduling projects with multi-skilled personnel by a hybrid MILP/CP Benders decomposition algorithm
- Scheduling and staffing multiple projects with a multi-skilled workforce
- An evaluation of the adequacy of project network generators with systematically sampled networks
- Chained cross-training of assembly line workers
- An efficient metaheuristic for integrated scheduling and staffing IT projects based on a generalized minimum cost flow network
- A Branch-and-Bound method for solving Multi-Skill Project Scheduling Problem
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
This page was built for publication: A new algorithm for resource-constrained project scheduling with breadth and depth of skills