Multi-period hazardous waste collection planning with consideration of risk stability
From MaRDI portal
Publication:2031336
DOI10.3934/jimo.2019117zbMath1474.90058OpenAlexW2977408732MaRDI QIDQ2031336
Publication date: 9 June 2021
Published in: Journal of Industrial and Management Optimization (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.3934/jimo.2019117
Mixed integer programming (90C11) Multi-objective and goal programming (90C29) Linear programming (90C05) Management decision making, including multiple objectives (90B50) Transportation, logistics and supply chain management (90B06)
Uses Software
Cites Work
- Generalized route planning model for hazardous material transportation with VaR and equity considerations
- A comprehensive modeling framework for hazmat network design, hazmat response team location, and equity of risk
- A stochastic multi-period industrial hazardous waste location-routing problem: integrating NSGA-II and Monte Carlo simulation
- A multi-objective mathematical model for the industrial hazardous waste location-routing problem
- A model to assess risk, equity and efficiency in facility location and transportation of hazardous materials
- Objectives Derived form Viewing Hazmat Shipments as a Sequence of Independent Bernoulli Trials
This page was built for publication: Multi-period hazardous waste collection planning with consideration of risk stability