Component allocation in make-to-stock assembly systems
From MaRDI portal
Publication:2033404
DOI10.1007/s43069-021-00067-yzbMath1466.90003OpenAlexW3173808284MaRDI QIDQ2033404
Publication date: 17 June 2021
Published in: SN Operations Research Forum (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s43069-021-00067-y
Transportation, logistics and supply chain management (90B06) Inventory, storage, reservoirs (90B05)
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Decentral allocation planning in multi-stage customer hierarchies
- Optimal and heuristic policies for assemble-to-order systems with different review periods
- Revenue management and demand fulfillment: Matching applications, models, and software
- Optimization of safety stocks in models with an order service level objective or constraint
- Assemble-to-order systems: a review
- A novel decomposition-based method for solving general-product structure assemble-to-order systems
- Determining near optimal base-stock levels in two-stage general inventory systems
- Allocation planning under service-level contracts
- On inventory allocation for periodic review assemble-to-order systems
- Technical Note—Optimal Structural Results for Assemble-to-Order Generalized M-Systems
- No-Holdback Allocation Rules for Continuous-Time Assemble-to-Order Systems
- A Stochastic Programming Based Inventory Policy for Assemble-to-Order Systems with Application to the W Model
- TECHNICAL NOTE—Optimal Control of an Assembly System with Multiple Stages and Multiple Demand Classes
- Asymptotically Optimal Inventory Control for Assemble-to-Order Systems with Identical Lead Times
- Optimization of Industrial-Scale Assemble-to-Order Systems
- Equalization of Runout Times
This page was built for publication: Component allocation in make-to-stock assembly systems