Long-term plantation and harvesting planning for industrial plantation forest areas
From MaRDI portal
Publication:2033406
DOI10.1007/s43069-021-00069-wzbMath1462.91014OpenAlexW3182464926MaRDI QIDQ2033406
Publication date: 17 June 2021
Published in: SN Operations Research Forum (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s43069-021-00069-w
harvestingmixed integer programmingforest managementplantationadjacency constraintmaximum area restriction
Mixed integer programming (90C11) Combinatorial optimization (90C27) Environmental economics (natural resource models, harvesting, pollution, etc.) (91B76)
Uses Software
Cites Work
- A cutting plane method for solving harvest scheduling models with area restrictions
- Modeling target volume flows in forest harvest scheduling subject to maximum area restrictions
- Operations research challenges in forestry: 33 open problems
- Branch-and-cut for the forest harvest scheduling subject to clearcut and core area constraints
- Forest harvest scheduling with clearcut and core area constraints
- A multicriteria optimization model for sustainable forest management under climate change uncertainty: an application in Portugal
- A branch-and-bound procedure for forest harvest scheduling problems addressing aspects of habitat availability
- A New Mixed-Integer Programming Model for Harvest Scheduling Subject to Maximum Area Restrictions
- Imposing Connectivity Constraints in Forest Planning Models
- Harvest Scheduling Subject to Maximum Area Restrictions: Exploring Exact Approaches
This page was built for publication: Long-term plantation and harvesting planning for industrial plantation forest areas