An improved algorithm for a two-stage production scheduling problem with an outsourcing option

From MaRDI portal
Publication:2034787

DOI10.1016/j.tcs.2021.05.022zbMath1504.90059OpenAlexW3165185214MaRDI QIDQ2034787

Xiaojuan Jiang, Guangting Chen, Kangbok Lee, Yong Chen, An Zhang

Publication date: 23 June 2021

Published in: Theoretical Computer Science (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.tcs.2021.05.022






Cites Work


This page was built for publication: An improved algorithm for a two-stage production scheduling problem with an outsourcing option