A fuzzy robustness measure for the scheduling of commissioned product development projects
From MaRDI portal
Publication:2036560
DOI10.1016/j.fss.2019.02.015zbMath1464.90031OpenAlexW2919033597MaRDI QIDQ2036560
Maren Gäde, Matthias Gerhard Wichmann, Thomas Stefan Spengler
Publication date: 29 June 2021
Published in: Fuzzy Sets and Systems (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.fss.2019.02.015
Uses Software
Cites Work
- Fuzzy job-shop scheduling problems: a review
- A heuristic method for RCPSP with fuzzy activity times
- Time slack-based techniques for robust project scheduling subject to resource uncertainty
- Ranking fuzzy numbers with integral value.
- A classification of predictive-reactive project scheduling procedures
- Bi-objective resource-constrained project scheduling with robustness and makespan criteria
- Robust scheduling and robustness measures for the discrete time/cost trade-off problem
- Choosing robust solutions in discrete optimization problems with fuzzy costs
- Fuzzy sets as a basis for a theory of possibility
- PSPLIB -- a project scheduling problem library
- A fuzzy robust scheduling approach for product development projects.
- A fuzzy project scheduling approach to minimize schedule risk for product development
- A hybrid simulation-optimization approach for the robust discrete time/cost trade-off problem
- The construction of stable project baseline schedules
- Defuzzification: criteria and classification
- Proactive policies for the stochastic resource-constrained project scheduling problem
- Analysis of critical paths in a project network with fuzzy activity times
- Proactive heuristic procedures for robust project scheduling: An experimental analysis
- Fuzzy sets