Uncertainty integration in dynamic mining reserves
From MaRDI portal
Publication:2040718
DOI10.1007/s11004-020-09866-1zbMath1465.86015OpenAlexW3024218445MaRDI QIDQ2040718
Publication date: 14 July 2021
Published in: Mathematical Geosciences (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s11004-020-09866-1
direct sequential simulationquantile interpolation mixture modeluncertainty assessment in temporal scheduling
Cites Work
- Production scheduling with uncertain supply: a new solution to the open pit mining problem
- Using aggregation to optimize long-term production planning at an underground mine
- Direct sequential simulation and cosimulation
- A solution approach for optimizing long- and short-term production scheduling at LKAB's kiruna mine
- Optimizing Long-Term Production Plans in Underground and Open-Pit Copper Mines
This page was built for publication: Uncertainty integration in dynamic mining reserves