Single-machine scheduling with periodic due dates to minimize the total earliness and tardy penalty
From MaRDI portal
Publication:2045022
DOI10.1007/s10878-021-00714-4zbMath1473.90067OpenAlexW3133745779MaRDI QIDQ2045022
Byung-Cheon Choi, Myoung-Ju Park
Publication date: 11 August 2021
Published in: Journal of Combinatorial Optimization (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10878-021-00714-4
Cites Work
- On the complexity of generalized due date scheduling problems
- A note on the SPT heuristic for solving scheduling problems with generalized due dates
- Unary NP-hardness of minimizing total weighted tardiness with generalized due dates
- On the fixed interval due-date scheduling problem
- Strong NP-hardness of minimizing total deviation with generalized and periodic due dates
- Unary NP-hardness of minimizing the total deviation with generalized or assignable due dates
- Scheduling jobs on parallel machines to minimize a regular step total cost function
- Faster algorithms for the shortest path problem
- Scheduling with Fixed Delivery Dates
- Earliness-Tardiness Scheduling Problems, I: Weighted Deviation of Completion Times About a Common Due Date
- Earliness–Tardiness Scheduling Problems, II: Deviation of Completion Times About a Restrictive Common Due Date
- Just-In-Time Scheduling with Generalized Due Dates and Identical Due Date Intervals
- Integrated Production, Inventory and Delivery Problems: Complexity and Algorithms
- Unnamed Item
- Unnamed Item
This page was built for publication: Single-machine scheduling with periodic due dates to minimize the total earliness and tardy penalty