Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Three-machine open shop with a bottleneck machine revisited

From MaRDI portal
Publication:2061137
Jump to:navigation, search

DOI10.1007/S10951-020-00652-9zbMath1479.90086OpenAlexW3095608774MaRDI QIDQ2061137

Inna G. Drobouchevitch

Publication date: 13 December 2021

Published in: Journal of Scheduling (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1007/s10951-020-00652-9


zbMATH Keywords

schedulingopen shopminimum makespan


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35)


Related Items (1)

Complexity and approximation of open shop scheduling to minimize the makespan: a review of models and approaches




Cites Work

  • Unnamed Item
  • Unnamed Item
  • Unnamed Item
  • Unnamed Item
  • Makespan minimization in open shops: A polynomial time approximation scheme
  • A polynomial algorithm for the three-machine open shop with a bottleneck machine
  • A cyclical search for the two machine flow shop and open shop to minimise finishing time
  • Open-shop dense schedules: properties and worst-case performance ratio
  • Open Shop Scheduling to Minimize Finish Time
  • Approximation Algorithms for Three-Machine Open Shop Scheduling
  • Short Shop Schedules
  • How good is a dense shop schedule?




This page was built for publication: Three-machine open shop with a bottleneck machine revisited

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:2061137&oldid=14547059"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 1 February 2024, at 20:19.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki