Two-agent integrated scheduling of production and distribution operations with fixed departure times
From MaRDI portal
Publication:2076366
DOI10.3934/jimo.2021005zbMath1499.90088OpenAlexW3121943256MaRDI QIDQ2076366
Yunqing Zou, Chin-Chia Wu, Zhengkui Lin, Dongya Han, Cheng, T. C. Edwin
Publication date: 16 February 2022
Published in: Journal of Industrial and Management Optimization (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.3934/jimo.2021005
Deterministic scheduling theory in operations research (90B35) Dynamic programming (90C39) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20)
Cites Work
- Single machine batch scheduling with two competing agents to minimize total flowtime
- Two-agent scheduling with agent specific batches on an unbounded serial batching machine
- Scheduling two agents with controllable processing times
- Optimizing production and transportation in a commit-to-delivery business mode
- Scheduling with batching: A review
- A common framework and taxonomy for multicriteria scheduling problems with interfering and competing jobs: multi-agent scheduling problems
- Two-agent scheduling on unrelated parallel machines with total completion time and weighted number of tardy jobs criteria
- Unbounded parallel-batching scheduling with two competitive agents
- Single machine scheduling with delivery dates and cumulative payoffs
- Integrated production and distribution with fixed delivery departure dates
- A multiple-criterion model for machine scheduling
- Integrated Production and Outbound Distribution Scheduling: Review and Extensions
- Competitive Two-Agent Scheduling and Its Applications
- Integrated production, inventory, and batch delivery scheduling with due date assignment and two competing agents
- Scheduling with Fixed Delivery Dates
- Supply Chain Scheduling: Batching and Delivery
- Scheduling Problems with Two Competing Agents
- The Weighted Total Tardiness Problem with Fixed Shipping Times and Overtime Utilization
- Single machine just‐in‐time scheduling problems with two competing agents
- Integrated Production, Inventory and Delivery Problems: Complexity and Algorithms
- Two‐agent scheduling with linear resource‐dependent processing times
This page was built for publication: Two-agent integrated scheduling of production and distribution operations with fixed departure times