A tree search heuristic for the resource constrained project scheduling problem with transfer times
From MaRDI portal
Publication:2079399
DOI10.1016/j.ejor.2022.05.014OpenAlexW4280644038MaRDI QIDQ2079399
Publication date: 29 September 2022
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2022.05.014
Related Items (3)
New pseudo polynomial algorithms for a partial resource-constrained project scheduling problem ⋮ A branch-and-bound algorithm for the unit-capacity resource constrained project scheduling problem with transfer times ⋮ A two‐layer approach for solving robust decentralized multiproject scheduling problem with multi‐skilled staff
Uses Software
Cites Work
- Unnamed Item
- A flow-based tabu search algorithm for the RCPSP with transfer times
- Scheduling of multiple projects with resource transfers
- A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times
- A priority-rule method for project scheduling with work-content constraints
- Scheduling subject to resource constraints: Classification and complexity
- PSPLIB -- a project scheduling problem library
- A branch and bound algorithm for the resource-constrained project scheduling problem
- An exact composite lower bound strategy for the resource-constrained project scheduling problem
- An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: the single mode case
- Bidirectional planning: Improving priority rule-based heuristics for scheduling resource-constrained projects
- An efficient genetic algorithm for decentralized multi-project scheduling with resource transfers
- Iterative beam search algorithms for the permutation flowshop
- A beam search algorithm for the biobjective container loading problem
- An updated survey of variants and extensions of the resource-constrained project scheduling problem
- A survey of hybrid metaheuristics for the resource-constrained project scheduling problem
- A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem
- Managing and modelling general resource transfers in (multi-)project scheduling
- An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation
- Resource Constrained Multi-Project Scheduling Problem with Resource Transfer Times
- A Tree Search Algorithm for Solving the Container Loading Problem
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
This page was built for publication: A tree search heuristic for the resource constrained project scheduling problem with transfer times