Single-machine Pareto-scheduling with multiple weighting vectors for minimizing the total weighted late works
From MaRDI portal
Publication:2083387
DOI10.3934/jimo.2021192OpenAlexW3214907038MaRDI QIDQ2083387
Shuen Guo, Zhichao Geng, Jinjiang Yuan
Publication date: 10 October 2022
Published in: Journal of Industrial and Management Optimization (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.3934/jimo.2021192
schedulingmultiple weightsfully polynomial-time approximation schemePareto-frontierweighted late work
Deterministic scheduling theory in operations research (90B35) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20)
Related Items (1)
Cites Work
- Unnamed Item
- Unnamed Item
- Minimizing mean weighted execution time loss on identical and uniform processors
- Minimizing the number of tardy job units under release time constraints
- Approximation algorithms for scheduling a single machine to minimize total late work
- Minimizing the weighted number of tardy task units
- A two-agent single-machine scheduling problem with late work criteria
- Scheduling on parallel identical machines with late work criterion: offline and online cases
- The two-machine flow-shop problem with weighted late work criterion and common due date
- Two-agent preemptive Pareto-scheduling to minimize the number of tardy jobs and total late work
- Minimizing total late work on a single machine with generalized due-dates
- Single-machine scheduling with multi-agents to minimize total weighted late work
- Single-machine scheduling with maintenance activities and rejection
- Two competitive agents to minimize the weighted total late work and the total completion time
- Two-agent scheduling problems on a single-machine to minimize the total weighted late work
- A note on a two-agent scheduling problem related to the total weighted late work
- The complexity of two supply chain scheduling problems
- Scheduling with competing agents, total late work and job rejection
- THE NP-HARDNESS OF MINIMIZING THE TOTAL LATE WORK ON AN UNBOUNDED BATCH MACHINE
- Single Machine Scheduling to Minimize Total Late Work
- On Finding the Maxima of a Set of Vectors
- A Fully Polynomial Approximation Scheme for Scheduling a Single Machine to Minimize Total Weighted Late Work
- When Does a Dynamic Programming Formulation Guarantee the Existence of a Fully Polynomial Time Approximation Scheme (FPTAS)?
- Single Machine Scheduling to Minimize Total Weighted Late Work
- Single‐machine scheduling with deadlines to minimize the total weighted late work
- Pareto‐optimization of three‐agent scheduling to minimize the total weighted completion time, weighted number of tardy jobs, and total weighted late work
This page was built for publication: Single-machine Pareto-scheduling with multiple weighting vectors for minimizing the total weighted late works