A production-reliability-inventory model for a series-parallel system with mixed strategy considering shortage, warranty period, credit period in crisp and stochastic sense
From MaRDI portal
Publication:2085494
DOI10.1007/s12597-022-00578-0OpenAlexW4220686926MaRDI QIDQ2085494
Shyamal Kumar Mondal, Anushri Maji, Asoke Kumar Bhunia
Publication date: 18 October 2022
Published in: Opsearch (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s12597-022-00578-0
Related Items (1)
Cites Work
- Unnamed Item
- Unnamed Item
- Risk analysis in a production inventory model with fuzzy demand, variable production rate and production time dependent selling price
- Sustainable trade credit and replenishment decisions with credit-linked demand under carbon emission constraints
- A hybrid vendor managed inventory and redundancy allocation optimization problem in supply chain management: an NSGA-II with tuned parameters
- Mixture inventory model of lost sale and back-order with stochastic lead time demand on permissible delay in payments
- Optimal retailer's inventory policy under supplier credits linket to retailer payment time
- Reliability stochastic optimization for a series system with interval component reliability via genetic algorithm
- A theorem on the determination of economic order quantity under conditions of permissible delay in payments
- An integrated inventory model with warranty dependent credit period under two policies of a manufacturer
- Optimal production run length and warranty period for an imperfect production system under selling price dependent on warranty period
- Analysis of an inventory system with discrete scheduling period, time-dependent demand and backlogged shortages
- Reliability analysis of a single warm-standby system subject to repairable and nonrepairable failures
- Maintenance models in warranty: a literature review
- Reliability of coherent systems with a single cold standby component
- Investigation of two-warehouse inventory problems in interval environment under inflation via particle swarm optimization
- Economic Order Quantity under Conditions of Permissible Delay in Payments
- Optimal Allocation of Redundant Components for Large Systems
- Determining Component Reliability and Redundancy for Optimum System Reliability
- A heuristic method for solving redundancy optimization problems in complex systems
- Ordering Policies of Deteriorating Items under Permissible Delay in Payments
- Dynamic Programming and the Reliability of Multicomponent Devices
This page was built for publication: A production-reliability-inventory model for a series-parallel system with mixed strategy considering shortage, warranty period, credit period in crisp and stochastic sense