Due date assignment scheduling with positional-dependent weights and proportional setup times
From MaRDI portal
Publication:2086881
DOI10.3934/mbe.2022238zbMath1501.90035OpenAlexW4224215367MaRDI QIDQ2086881
Peizhen Zhao, Lu Li, Weiguo Liu, Xuyin Wang, Rui-feng Zhang
Publication date: 26 October 2022
Published in: Mathematical Biosciences and Engineering (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.3934/mbe.2022238
Related Items (5)
Due-window assignment scheduling with job-rejection, truncated learning effects and setup times ⋮ Resource dependent scheduling with truncated learning effects ⋮ Polynomial time algorithm for minmax scheduling with common due-window and proportional-linear shortening processing times ⋮ Special issue: Mathematical problems in production research ⋮ Study on resource allocation scheduling problem with learning factors and group technology
Cites Work
- The third comprehensive survey on scheduling problems with setup times/costs
- Several flow shop scheduling problems with truncated position-based learning effect
- Single machine scheduling with general time-dependent deterioration, position-dependent learning and past-sequence-dependent setup times
- Single machine past-sequence-dependent setup times scheduling with general position-dependent and time-dependent learning effects
- Unrelated parallel machine scheduling with past-sequence-dependent setup time and learning effects
- Single-machine scheduling with deteriorating jobs and past-sequence-dependent setup times
- Single-machine scheduling against due dates with past-sequence-dependent setup times
- A survey of the state-of-the-art of common due date assignment and scheduling research
- Scheduling problems with past-sequence-dependent setup times and general effects of deterioration and learning
- Single machine resource allocation scheduling problems with deterioration effect and general positional effect
- Single-machine due-date assignment scheduling with generalized earliness-tardiness penalties including proportional setup times
- Bicriterion scheduling with group technology and deterioration effect
- New results for single-machine scheduling with past-sequence-dependent setup times and due date-related objectives
- A survey of scheduling problems with setup times or costs
- Single-machine scheduling problems with past-sequence-dependent setup times
- Scheduling with position-dependent weights, due-date assignment and past-sequence-dependent setup times
- Proportionate flowshop scheduling with position-dependent weights
- Scheduling
- Single-machine scheduling problems with job rejection, deterioration effects and past-sequence-dependent setup times
- Unnamed Item
This page was built for publication: Due date assignment scheduling with positional-dependent weights and proportional setup times