Optimization of inventory system with defects, rework failure and two types of errors under crisp and fuzzy approach
From MaRDI portal
Publication:2086914
DOI10.3934/jimo.2021068OpenAlexW3153465765MaRDI QIDQ2086914
Abolfazl Mirzazadeh, Javad Taheri
Publication date: 26 October 2022
Published in: Journal of Industrial and Management Optimization (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.3934/jimo.2021068
Related Items (2)
The impact of greenness, inflation, and trade credit on multi-item fuzzy EOQ model with partial backordering and deterioration ⋮ A higher-order Markov model for a hybrid inventory system with probabilistic remanufacturing demand
Cites Work
- Unnamed Item
- Mathematical modeling for determining the replenishment policy for EMQ model with rework and multiple shipments
- An inventory model for imperfect items under inflationary conditions with considering inspection errors
- The derivation of EOQ/EPQ inventory models with two backorders costs using analytic geometry and algebra
- An economic order quantity with imperfect quality and quantity discounts
- Parametric nonlinear programming approach to fuzzy queues with bulk service
- Economic production quantity model with repair failure and limited capacity
- Solving fuzzy queueing decision problems via a parametric mixed integer nonlinear programming method
- Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
- Is there a need for fuzzy logic?
- Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown
- An easy method to derive EOQ and EPQ inventory models with backorders
- A simple method to compute economic order quantities: some observations
- Robust planning in optimization for production system subject to random machine breakdown and failure in rework
- Fuzzy sets of type 2 under algebraic product and algebraic sum
- The concept of a linguistic variable and its application to approximate reasoning. I
- Fuzzy inventory model for deteriorating items in a green supply chain with carbon concerned demand
- An EOQ model for fuzzy defective rate with allowable proportionate discount
- An application of fuzzy sets theory to the EOQ model with imperfect quality items
- Profit maximization solid transportation problem with trapezoidal interval type-2 fuzzy numbers
- Production lot size problem with failure in repair and backlogging derived without derivatives
- Multiproduct single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint
- Joint determination of the lot size and number of shipments for a family of integrated vendor–buyer systems considering defective products
- Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System
- A Multi-item EPQ Model with Variable Demand in an Imperfect Production Process
- Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging
This page was built for publication: Optimization of inventory system with defects, rework failure and two types of errors under crisp and fuzzy approach