Production, maintenance and resource scheduling: a review
From MaRDI portal
Publication:2098022
DOI10.1016/j.ejor.2022.03.045OpenAlexW4220749964MaRDI QIDQ2098022
Zümbül Atan, M. Geurtsen, J. Adan, Jeroen B. H. C. Didden, Ivo J. B. F. Adan
Publication date: 17 November 2022
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2022.03.045
Related Items (1)
Cites Work
- Unnamed Item
- A memetic algorithm to solve an unrelated parallel machine scheduling problem with auxiliary resources in semiconductor manufacturing
- Parallel-machine scheduling with maintenance: praising the assignment problem
- Two meta-heuristic algorithms for solving multi-objective flexible job-shop scheduling with parallel machine and maintenance constraints
- Unrelated parallel-machine scheduling with rate-modifying activities to minimize the total completion time
- Unrelated parallel-machine scheduling problems with aging effects and deteriorating maintenance activities
- Parallel machine scheduling with a deteriorating maintenance activity and total absolute differences penalties
- Simultaneous job scheduling and resource allocation on parallel machines
- Scheduling with job-dependent learning effects and multiple rate-modifying activities
- Scheduling jobs under increasing linear machine maintenance time
- Two-machine flow shop and open shop scheduling problems with a single maintenance window
- Unrelated parallel-machine scheduling with deterioration effects and deteriorating multi-maintenance activities for minimizing the total completion time
- Scheduling with flexible resources in parallel workcenters to minimize maximum completion time
- Scheduling uniform parallel machines subject to a secondary resource to minimize the number of tardy jobs
- Machine scheduling with resource dependent processing times
- Considering scheduling and preventive maintenance in the flowshop sequencing problem
- A two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machines
- Note on ``Unrelated parallel-machine scheduling with rate-modifying activities to minimize the total completion time
- An approximation algorithm for identical parallel machine scheduling with resource dependent processing times
- Parallel machine scheduling with almost periodic maintenance and non-preemptive jobs to minimize makespan
- Two-parallel machines scheduling with rate-modifying activities to minimize total completion time
- Scheduling jobs with time-resource tradeoff via nonlinear programming
- Scheduling subject to resource constraints: Classification and complexity
- Scheduling tasks on two processors with deadlines and additional resources
- Minimizing mean flow time with parallel processors and resource constraints
- Modeling simultaneous worker learning and forgetting in dual resource constrained systems
- Deadline scheduling of tasks with ready times and resource constraints
- Polynomial algorithms for resource-constrained and multiprocessor task scheduling problems
- Heuristics for parallel-machine flexible-resource scheduling problems with unspecified job assignment
- Tight approximations for resource constrained scheduling and bin packing
- An analysis of heuristics for the parallel-machine flexible-resource scheduling problem
- Uniform machine scheduling of unit-time jobs subject to resource constraints
- Parallel machine scheduling with earliness--tardiness penalties and additional resource con\-straints.
- Scheduling problems for parallel dedicated machines under multiple resource constraints.
- Minimizing the makespan for the flow shop scheduling problem with availability constraints.
- The impact of resource flexibility and staffing decisions on cellular and departmental shop performance
- Machine scheduling with a rate-modifying activity
- Matheuristic approaches for parallel machine scheduling problem with time-dependent deterioration and multiple rate-modifying activities
- Algorithms for the unrelated parallel machine scheduling problem with a resource constraint
- Parallel-machine scheduling problems with past-sequence-dependent delivery times and aging maintenance
- Two-stage assembly scheduling with batch setup times, time-dependent deterioration, and preventive maintenance activities using meta-heuristic algorithms
- Decomposition algorithms for synchronous flow shop problems with additional resources and setup times
- Models and matheuristics for the unrelated parallel machine scheduling problem with additional resources
- Parallel machine scheduling with speed-up resources
- Unrelated parallel-machine scheduling with aging effects and multi-maintenance activities
- Algorithms for minimizing maximum lateness with unit length tasks and resource constraints
- A heuristic approach to allocating the continuous resource in discrete--continuous scheduling problems to minimize the makespan
- Scheduling parallel dedicated machines under a single non-shared resource
- Scheduling with limited machine availability
- A discrete artificial bee colony algorithm for the multi-objective flexible job-shop scheduling problem with maintenance activities
- Bi-objective ant colony optimization approach to optimize production and maintenance scheduling
- Enriched metaheuristics for the resource constrained unrelated parallel machine scheduling problem
- Evolutionary algorithms for multi-objective dual-resource constrained flexible job-shop scheduling problem
- Parallel machine scheduling with additional resources: notation, classification, models and solution methods
- A heuristic for scheduling in a two-stage hybrid flowshop with renewable resources shared among the stages
- Scheduling jobs and maintenance activities on parallel machines
- Scheduling jobs and maintenance activities subject to job-dependent machine deteriorations
- MIP models and a matheuristic algorithm for an identical parallel machine scheduling problem under multiple copies of shared resources constraints
- Scheduling with due date assignment under special conditions on job processing
- Unrelated parallel-machine scheduling with deteriorating maintenance activities to minimize the total completion time
- Unrelated parallel-machine scheduling problems with multiple rate-modifying activities
- A two-machine flowshop scheduling problem with a separated maintenance constraint
- Two-machine flow shop no-wait scheduling with machine maintenance
- Unrelated Parallel-Machine Scheduling with Controllable Processing Times and Impact of Deteriorating Maintenance Activities under Consideration
- Parallel Machine Scheduling with Additional Resources: A Lagrangian-Based Constraint Programming Approach
- Flow Shop Scheduling with Partial Resource Flexibility
- Examination of flexibility acquisition policies in dual resource constrained job shops with simultaneous worker learning and forgetting effects
- A GRASP algorithm for flexible job-shop scheduling with maintenance constraints
- A multi-criteria adaptive control scheme based on neural networks and fuzzy inference for DRC manufacturing systems
- Planning Machine Maintenance in Two-Machine Shop Scheduling
- LP Rounding and an Almost Harmonic Algorithm for Scheduling with Resource Dependent Processing Times
- Unrelated Parallel Machine Scheduling with Resource Dependent Processing Times
- Complexity Results for Multiprocessor Scheduling under Resource Constraints
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Scheduling Parallel Manufacturing Cells with Resource Flexibility
- An evaluation of worker assignment policies in dual resource-constrained job shops with heterogeneous resources and worker transfer delays
- Managing worker flexibility and attrition in dual resource constrained job shops
- On the who-rule in Dual Resource Constrained (DRC) manufacturing systems
- Scheduling jobs and maintenance activities on parallel machines
- Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study
- Joint optimization of preventive maintenance and flexible flowshop sequence-dependent group scheduling considering multiple setups
- Joint optimization of preventive maintenance and production scheduling for parallel machines system
- Scheduling parallel dedicated machines with the speeding‐up resource
- Minimizing makespan for two parallel machines with job limit on each availability interval
- Worker flexibility in a parallel dual resource constrained job shop
- Scheduling
This page was built for publication: Production, maintenance and resource scheduling: a review