Solving the integrated multi-period scheduling routing problem for cleaning debris in the aftermath of disasters
From MaRDI portal
Publication:2106726
DOI10.1016/j.ejor.2022.07.005OpenAlexW4284990834WikidataQ114194223 ScholiaQ114194223MaRDI QIDQ2106726
Christian Prins, Andréa Cynthia Santos, Guilherme de Castro Pena
Publication date: 19 December 2022
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2022.07.005
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- A survey of recent research on location-routing problems
- Network repair crew scheduling and routing for emergency relief distribution problem
- Road network emergency accessibility planning after a major earthquake
- A survey of dynamic network flows
- The vehicle routing problem. Latest advances and new challenges.
- A survey of variants and extensions of the resource-constrained project scheduling problem
- A hybrid heuristic algorithm for the open-pit-mining operational planning problem
- Scheduling subject to resource constraints: Classification and complexity
- Vehicle routing with full loads
- An adaptive large neighborhood search for the full truckload pickup and delivery problem with resource synchronization
- A branch-and-Benders-cut algorithm for the crew scheduling and routing problem in road restoration
- Integrated optimal scheduling of repair crew and relief vehicle after disaster
- Multiple vehicle synchronisation in a full truck-load pickup and delivery problem: a case-study in the biomass supply chain
- Multi-vehicle synchronized arc routing problem to restore post-disaster network connectivity
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Probability distribution of solution time in GRASP: an experimental investigation
- Integration of routing into a resource-constrained project scheduling problem
- OR/MS research in disaster operations management
- TTT plots: a perl program to create time-to-target plots
- Algorithms for the Vehicle Routing and Scheduling Problems with Time Window Constraints
- The Post-Disaster Debris Clearance Problem Under Incomplete Information
- Integer Programming Formulation of Traveling Salesman Problems
- The Split Delivery Vehicle Routing Problem: A Survey