Two-level supply chain inventory model for perishable goods with fuzzy lead-time and shortages
From MaRDI portal
Publication:2114645
DOI10.1007/s40819-021-01117-zzbMath1484.90008OpenAlexW3196549206MaRDI QIDQ2114645
Amalesh Kumar Manna, Shyamal Kumar Mondal, Ali Akbar Shaikh, Rabin Kumar Mallick
Publication date: 15 March 2022
Published in: International Journal of Applied and Computational Mathematics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s40819-021-01117-z
Cites Work
- A fuzzy random periodic review system with variable lead-time and negative exponential crashing cost
- EPL models with fuzzy imperfect production system including carbon emission: a fuzzy differential equation approach
- Mixture inventory model of lost sale and back-order with stochastic lead time demand on permissible delay in payments
- An economic order quantity model for deteriorating item in a purchasing system with multiple prepayments
- An EOQ model for perishable goods with age-dependent demand rate
- \((S-1,S)\) perishable systems with stochastic leadtimes
- A two-level trade-credit approach to an integrated price-sensitive inventory model with shortages
- Intuitionistic fuzzy optimization technique for Pareto optimal solution of manufacturing inventory models with shortages
- Optimal production run length for products sold with warranty in an imperfect production system with allowable shortages
- An interactive method for inventory control with fuzzy lead-time and dynamic demand
- An EOQ model with fuzzy inflation rate and fuzzy deterioration rate when a delay in payment is permissible
- Inventory Models Involving Lead Time as a Decision Variable
- An ordering policy for deteriorating items with allowable shortage and permissible delay in payment
- On the inventory model with variable lead time and price–quantity discount
- Adjustment of credit period and stock-dependent demands in a supply chain model with variable imperfectness
- Fuzzy sets
- Inventory models with a mixture of backorders and lost sales
- Recent trends in modeling of deteriorating inventory
- Price discount facility in an EOQ model for deteriorating items with stock‐dependent demand and partial backlogging
- The effect of advance payment with discount facility on supply decisions of deteriorating products whose demand is both price and stock dependent
This page was built for publication: Two-level supply chain inventory model for perishable goods with fuzzy lead-time and shortages