Scheduling with generalized and periodic due dates under single- and two-machine environments
From MaRDI portal
Publication:2115317
DOI10.1007/S11590-021-01739-8zbMath1489.90023OpenAlexW3153589277MaRDI QIDQ2115317
Yunhong Min, Byung-Cheon Choi, Kyung Min Kim, Myoung-Ju Park
Publication date: 15 March 2022
Published in: Optimization Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s11590-021-01739-8
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- On the complexity of generalized due date scheduling problems
- Unary NP-hardness of minimizing total weighted tardiness with generalized due dates
- Scheduling shops to minimize the weighted number of late jobs
- Strong NP-hardness of minimizing total deviation with generalized and periodic due dates
- Unary NP-hardness of minimizing the total deviation with generalized or assignable due dates
- Single-machine scheduling to minimize the total earliness and tardiness is strongly NP-hard
- Optimal two- and three-stage production schedules with setup times included
- Scheduling with Fixed Delivery Dates
- Earliness-Tardiness Scheduling Problems, I: Weighted Deviation of Completion Times About a Common Due Date
- Earliness–Tardiness Scheduling Problems, II: Deviation of Completion Times About a Restrictive Common Due Date
- The Complexity of Flowshop and Jobshop Scheduling
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Just-In-Time Scheduling with Generalized Due Dates and Identical Due Date Intervals
- Two-Machine Ordered Flow Shop Scheduling with Generalized Due Dates
- A Functional Equation and its Application to Resource Allocation and Sequencing Problems
This page was built for publication: Scheduling with generalized and periodic due dates under single- and two-machine environments