Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Two-machine flow shop scheduling with a common due date to maximize total early work - MaRDI portal

Two-machine flow shop scheduling with a common due date to maximize total early work

From MaRDI portal
Publication:2116855

DOI10.1016/j.ejor.2021.07.055zbMath1495.90067OpenAlexW3193438168WikidataQ115198388 ScholiaQ115198388MaRDI QIDQ2116855

Qian Miao, Xin Chen, Małgorzata Sterna, Bertrand M. T. Lin, Jacek Błażewicz

Publication date: 18 March 2022

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2021.07.055




Related Items (2)



Cites Work


This page was built for publication: Two-machine flow shop scheduling with a common due date to maximize total early work