Short-term scheduling of production fleets in underground mines using CP-based LNS
From MaRDI portal
Publication:2117237
DOI10.1007/978-3-030-78230-6_23OpenAlexW3166206299MaRDI QIDQ2117237
Mikael Johansson, Max Åstrand, Hamid Reza Feyzmahdavian
Publication date: 21 March 2022
Full work available at URL: https://doi.org/10.1007/978-3-030-78230-6_23
Combinatorial optimization (90C27) Problem solving in the context of artificial intelligence (heuristics, search strategies, etc.) (68T20)
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Machine scheduling in underground mining: an application in the potash industry
- Optimal speedup of Las Vegas algorithms
- A survey of very large-scale neighborhood search techniques
- Principles for the design of large neighborhood search
- A general heuristic for vehicle routing problems
- An update on the comparison of MIP, CP and hybrid approaches for mixed resource allocation and scheduling
- Fleet scheduling in underground mines using constraint programming
- A hybrid of adaptive large neighborhood search and tabu search for the order-batching problem
- Staff and machine shift scheduling in a German potash mine
- A new mathematical formulation for a potash-mine shift scheduling problem with a simultaneous assignment of machines and workers
- Lightweight dynamic symmetry breaking
- Underground mine scheduling of mobile machines using constraint programming and large neighborhood search
- Solving Variants of the Job Shop Scheduling Problem Through Conflict-Directed Search