Two-machine routing open shop: How long is the optimal makespan?
From MaRDI portal
Publication:2117636
DOI10.1007/978-3-030-77876-7_17zbMath1485.90039OpenAlexW3173048457MaRDI QIDQ2117636
Publication date: 22 March 2022
Full work available at URL: https://doi.org/10.1007/978-3-030-77876-7_17
Related Items (2)
Exponential tightness for integral-type functionals of centered independent differently distributed random variables ⋮ Approximation algorithms for two-machine proportionate routing open shop on a tree
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Efficient approximation algorithms for the routing open shop problem
- On some properties of optimal schedules in the job shop problem with preemption and an arbitrary regular criterion
- A \(\frac 6 5\)-approximation algorithm for the two-machine routing open-shop problem on a two-node network
- Efficient algorithms for the routing open shop with unrelated travel times on cacti
- The routing open-shop problem on a network: complexity and approximation
- A historical note on the 3/2-approximation algorithm for the metric traveling salesman problem
- On the optima localization for the three-machine routing open shop
- Optimal two- and three-stage production schedules with setup times included
- The 2-Machine Routing Open Shop on a Triangular Transportation Network
- Open Shop Scheduling to Minimize Finish Time
- Two-machine routing open shop on a tree: instance reduction and efficiently solvable subclass
This page was built for publication: Two-machine routing open shop: How long is the optimal makespan?