Dynamic risk evaluation method for collapse disasters of drill-and-blast tunnels: a case study
From MaRDI portal
Publication:2130080
DOI10.3934/mbe.2022016zbMath1486.91025OpenAlexW3211337681MaRDI QIDQ2130080
Wei Huang, Weixing Qiu, Bo Wu, Shixiang Xu, Jingsong Huang, Guowang Meng
Publication date: 25 April 2022
Published in: Mathematical Biosciences and Engineering (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.3934/mbe.2022016
Cites Work
This page was built for publication: Dynamic risk evaluation method for collapse disasters of drill-and-blast tunnels: a case study