Scheduling multiple two-stage flowshops with a deadline
From MaRDI portal
Publication:2140576
DOI10.1016/j.tcs.2022.04.004OpenAlexW4226485472MaRDI QIDQ2140576
Yin Guo, Minjie Huang, Jian'er Chen
Publication date: 23 May 2022
Published in: Theoretical Computer Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.tcs.2022.04.004
Related Items (1)
Cites Work
- Unnamed Item
- Unnamed Item
- Approximation algorithms for the parallel flow shop problem
- An FPTAS for the parallel two-stage flowshop problem
- On scheduling multiple two-stage flowshops
- Improved approximation algorithms for two-stage flowshops scheduling problem
- On scheduling inclined jobs on multiple two-stage flowshops
- A polynomial-time approximation scheme for an arbitrary number of parallel two-stage flow-shops
- Scheduling two-stage jobs on multiple flowshops
- Scheduling a two-stage flowshop under makespan constraint
- Optimal two- and three-stage production schedules with setup times included
- A Fast Approximation Scheme for the Multiple Knapsack Problem
- Parameterized Approximation Scheme for the Multiple Knapsack Problem
- Packing Groups of Items into Multiple Knapsacks
- A Polynomial Time Approximation Scheme for the Multiple Knapsack Problem
This page was built for publication: Scheduling multiple two-stage flowshops with a deadline